Poured Wall Construction Quotes

Get Professional Services

Cost of Poured Wall Construction in Park City

Poured wall construction is a popular choice for both residential and commercial buildings in Park City, UT, due to its durability and strength. However, the cost of this construction method can vary significantly based on several factors. Understanding these factors and the common tasks involved can help you budget more effectively for your project.

Factors Affecting Cost

  • Site Preparation: The cost of preparing the construction site, including excavation and grading.
  • Material Quality: Higher quality materials will increase the overall cost.
  • Labor Costs: Skilled labor rates in Park City, UT.
  • Wall Thickness: Thicker walls require more materials and labor, thus increasing the cost.
  • Project Size: Larger projects tend to have a higher overall cost but may benefit from economies of scale.
  • Weather Conditions: Adverse weather can delay construction and increase costs.
  • Permits and Inspections: Fees for local permits and inspections.

Average Costs for Common Tasks

Task Average Cost (Park City, UT)
Site Preparation $1,500 - $5,000
Material Costs (per sq. ft.) $10 - $15
Labor Costs (per hour) $50 - $75
Wall Thickness (per sq. ft.) $12 - $18
Concrete Pouring (per cubic yard) $110 - $150
Formwork Installation $1,000 - $3,000
Finishing and Curing $500 - $1,500
Permits and Inspections $200 - $800

Understanding these factors and costs can help you make informed decisions about your poured wall construction project in Park City, UT.

Poured Wall Construction